Managing Distributed Teams Across Global Holidays: Overlap Calendars, SLAs & Sprint Planning

By Robert C. Dickerson Published Updated

Short Answer

Managing distributed teams across global holidays requires a unified operational calendar that distinguishes statutory public holidays, regional observances, bank and payment-rail closures, and exchange schedules. Teams must calculate individual availability, map overlap windows, set holiday-aware SLAs, and plan sprints with explicit buffers. This guide explains the mechanics, comparison data, edge cases, and a step-by-step playbook for HR, payroll, finance, and engineering operations.

Executive Overview & Operational Scope

Managing distributed teams across global holidays is not a calendar-decoration problem. It is an operational control problem that spans workforce capacity, payroll cutoffs, payment settlement, market access, and service-level commitments. A public holiday in one jurisdiction can remove a developer, a payroll approver, a treasury signatory, or a wire desk operator from the same 24-hour window in which another region expects normal service. The result is not only lost person-days; it is missed SLA clocks, failed dual-control approvals, delayed payroll files, unsettled trades, and sprint commitments that were never achievable.

This pillar hub defines the operational scope for global HR and payroll leads, distributed engineering managers, treasury and settlement operations, exporters, traders, and strategic leave planners. It distinguishes four calendar layers that are often conflated: (1) national statutory holidays, which create legal or public-sector leave entitlements; (2) regional and subdivision holidays under ISO 3166-2 states, cantons, provinces, devolved nations, or local administrations; (3) bank and payment-rail closures, such as Fedwire, ACH, SEPA TARGET2, SWIFT-dependent correspondent banking, and local clearing systems; and (4) equity, bond, commodity, and derivatives exchange closures or early closes. Each layer has its own source, update cadence, and operational consequence.

Regional holidays can leave a distributed engineering plan short of capacity even when every role appears staffed; a realistic plan calculates availability per person before combining totals (ONES, 2026). A team with members in five countries and roughly 12 public holidays per country faces approximately 60 potential disruption events per year, many of which do not overlap (Holiday Overlap, 2026). Asynchronous sprint planning adds a second constraint: review windows, ownership, and explicit deadlines must be set across time zones, and silence must never be treated as consent (ONES, 2026). The stakes are therefore both quantitative—available hours and settlement cutoffs—and procedural—who approves, who covers, and how a decision is recorded.

Global holiday operations work from a hierarchy of calendars, not a single “country holiday” list. The hierarchy should be explicit in every capacity plan, SLA schedule, and sprint calendar because the same date can be legally closed for one population, open for another, and operationally degraded for a third. The following mechanics are the minimum data model for cross-border planning.

Statutory, Regional, Bank, and Market Calendars Are Different Data Models

National statutory holidays are set by national labor law, public-service rules, or presidential decree. They usually determine payroll premiums, mandatory leave, and public-office closures, but they do not automatically close private banks, clearing systems, or exchanges. Regional and subdivision holidays sit below the national level: German Bundesländer, Swiss cantons, Canadian provinces, Australian states and territories, UK devolved nations, Indian states, and U.S. state or local observances. These are high-risk because a national calendar misses them while local payroll and banking calendars do not. Bank and payment-rail holidays are operational calendars published by central banks, clearing houses, and payment operators. Exchange calendars are published by the exchange or market operator and may include early closes that are not public holidays at all.

A payroll team may correctly observe a national holiday while a treasury desk discovers that a payment rail remains open; conversely, a market may close for a holiday that is not a statutory leave day for most private employers. The calendar source must match the decision: labor law for payroll and leave, central-bank and clearing documentation for settlement, exchange notices for trading, and regional government notices for subdivision-level leave. Tooling reinforces the distinction: in Jira, board working days change burndown, sprint, and velocity reports “and nothing else,” while Jira Service Management SLAs keep their own holidays and Jira Automation knows only Monday to Friday (Tiraisoft, 2026).

Observed-Date Substitution, Mondayization, and Bridge Days

Many jurisdictions move a holiday when it falls on a weekend. The common patterns are Mondayization (the following Monday becomes the observed holiday), Friday substitution (the preceding Friday is observed), or no substitution at all. The United States federal calendar generally observes a Saturday holiday on the preceding Friday and a Sunday holiday on the following Monday. The United Kingdom uses substitute bank holidays when certain holidays fall on weekends. Canada and Australia apply Mondayization rules at federal, provincial, or state level, but the exact scope differs. Germany and Switzerland are more fragmented: a national or cantonal holiday that falls on a weekend may not create a substitute workday closure, and the operational effect depends on the specific Land or canton.

Bridge days are the working days between a holiday and a weekend, or between two holidays. They are not always statutory closures, but they create predictable leave demand and reduced capacity. A Tuesday holiday after a Monday bridge day, or a Thursday holiday with a Friday bridge, can convert a one-day statutory closure into a four-day absence pattern. For payroll and SLA planning, bridge days should be modelled as high-probability leave events rather than guaranteed closures. The correct calculation is person-specific: statutory holiday entitlement, regional observance, approved leave, and shift schedule must be combined before a team capacity total is produced (ONES, 2026).

Payment-Rail Cutoffs and Settlement Cycles

Payment rails do not all follow the same holiday calendar. Fedwire Funds Service and Fedwire Securities Service operate on Federal Reserve business days; ACH processing follows Federal Reserve and Nacha operating schedules; SEPA and TARGET2/T2 settlement depend on the TARGET2 operating day, which is not identical to every euro-area national holiday. A national bank holiday in Germany, France, or Italy does not necessarily close TARGET2, but it can thin liquidity and correspondent-bank staffing. SWIFT is a messaging network, not a settlement system: SWIFT may carry messages on days when the underlying clearing system is closed, but value settlement and finality depend on the relevant rail and correspondent bank.

Operational cutoffs should be stored as rail + date + time zone + value date, not as a generic holiday flag. A wire initiated on a Friday afternoon in New York may settle on the next Fedwire business day, but the same instruction routed through a correspondent in a different time zone may miss a local cutoff. Payroll files add another layer: funding, file transmission, bank validation, and employee value date can each have separate deadlines. During holiday periods, the correct buffer is the longest dependency chain, not the shortest published cutoff.

Exchange Closures, Early Closes, and Market Calendars

Equity, bond, commodity, and derivatives exchanges publish their own holiday and early-close calendars. An exchange closure is not proof that banks are closed, and a bank holiday is not proof that an exchange is closed. In the United States, for example, equity-market holidays, Federal Reserve holidays, and fixed-income market recommendations can diverge; some fixed-income desks follow SIFMA-style recommendations that differ from equity-exchange schedules. In Europe, exchange calendars may close on dates that are not TARGET2 holidays, or remain open on dates when local bank branches are closed. Early closes are especially dangerous for SLAs because they shorten the operational day while leaving the date as a normal business day on many calendars.

Trading and settlement teams should maintain separate calendars for exchange trading hours, clearing and settlement windows, and bank funding cutoffs. A T+1 or T+2 settlement cycle is measured in business days on the relevant market and settlement calendar, not on the team’s local calendar. A holiday that falls between trade date and settlement date can extend the actual funding gap even when the trade date itself is a normal business day.

Workweek Geometry: Mon–Fri, Sun–Thu, Sat–Wed

Time-zone math is incomplete without workweek geometry. A standard Monday–Friday team in London, New York, or Singapore shares two weekend days with a Monday–Friday team in Tokyo, but a Sun–Thu team in the GCC or a Sat–Wed team in parts of the Middle East has a different weekly rhythm. The overlap window may be short not because of clock offset alone, but because one team’s Sunday is a working day while another team’s Sunday is a rest day. Saudi Arabia’s public-sector workweek has historically been Sun–Thu, with private-sector variation; the UAE federal government moved to a Monday–Friday week with a shortened Friday, while many private employers and regional entities maintain different patterns. Any overlap checker must therefore store workweek start day, weekend days, daily working hours, and prayer or midday breaks where operationally relevant.

Movable and Lunar Holidays: Proclamation Risk

Several major holidays are not fixed to the Gregorian date. Eid al-Fitr and Eid al-Adha depend on lunar sightings or official proclamation and can shift by a day across jurisdictions. Diwali follows the Hindu lunisolar calendar and is observed on different dates in different regions and communities. Lunar New Year shifts annually and may include multi-day public holidays in mainland China, Hong Kong, Singapore, Taiwan, Korea, Vietnam, and other jurisdictions. Japanese “citizen’s holidays” can create bridge days when a holiday falls between two other holidays. Indian festival holidays vary by state and central-government notification. These dates should be flagged as provisional until the official gazette, moon-sighting authority, or government proclamation is published. Capacity plans should carry a sensitivity range and a named owner for final confirmation.

Capacity Math and Overlap Windows

The core capacity formula is: available person-days = scheduled workdays − statutory holidays − regional holidays − approved leave − known absences − buffer, calculated per person and then aggregated. The buffer is not optional in cross-border teams; it absorbs movable-holiday shifts, unplanned sick leave, and time-zone handoff losses. Overlap windows should be calculated from actual working hours, not from a shared “core hours” assumption. A practical model records each person’s time zone, workweek, daily start/end, holiday calendar, and leave plan, then computes the intersection of working hours for each pair or team. That intersection is the real collaboration window for synchronous decisions. For asynchronous work, the handoff window matters more than the meeting window: what can be completed before the next region wakes up, and who owns the decision if no one is online?

SLA Design for Holiday Coverage

Holiday-aware SLAs should define coverage calendars, not just response targets. A “24-hour” response target is meaningless if the only approver is in a jurisdiction with a bank holiday and no delegated authority. Build SLAs with: (1) a named primary and backup owner per region; (2) a published coverage calendar that distinguishes statutory, regional, bank, and exchange closures; (3) paused-clock rules that are explicit and auditable; (4) escalation paths that cross time zones; and (5) service credits or exception reporting where holiday coverage is contractually limited. For internal engineering SLAs, separate incident response from routine review: critical incidents may require holiday coverage, while routine code review should be planned around known absences. In asynchronous sprint planning, review windows should carry clear deadlines and time zones, and silence must not be recorded as approval (ONES, 2026).

Sprint Planning Across Time Zones

Sprint planning should start from holiday-adjusted capacity, not from the team’s nominal velocity. The Product Owner and Developers need a shared sequence: publish candidate work with purpose, acceptance expectations, and known dependencies; assign owners to questions and blockers; set review windows with time zones; agree on the Sprint Goal and selected work; and record risks and follow-ups (ONES, 2026). In practice, this means the sprint calendar should show regional holidays, bridge-day leave risk, bank or market closures that affect dependent systems, and any team member with reduced availability. A sprint that crosses a major holiday should either reduce scope or increase the buffer; pretending the absent capacity is still available is the most common planning failure.

Global Comparison & Reference Matrix

The matrix below compares operational characteristics relevant to distributed teams. “Statutory count” is indicative and should be verified against the current official calendar; federal, national, provincial, cantonal, and state counts differ. “Bank vs. market impact” indicates whether payment rails and exchanges are likely to diverge, not a definitive legal conclusion for every transaction.

Jurisdiction / SystemTypical WorkweekObserved-Date / Rollover RuleRegional ScopeBank vs. Market ImpactStatutory Count (Indicative)Operational Cutoff / Note
United StatesMon–FriFederal weekend holidays usually observed Fri (Sat) or Mon (Sun); state rules varyFederal, state, localFedwire/ACH close on Federal Reserve holidays; NYSE and fixed-income calendars can diverge11 federal + state/localUse Federal Reserve and exchange calendars separately; watch early closes
United KingdomMon–FriSubstitute bank holidays for some weekend dates; devolved rules differEngland & Wales, Scotland, Northern IrelandBank holidays affect clearing and branches; LSE calendar is separate~8 England & Wales; variesCheck Bacs/CHAPS and exchange notices; Scotland/NI have extra dates
GermanyMon–FriNo universal Mondayization; regional rules and bridge effects matter16 BundesländerTARGET2/T2 closes on limited common dates; German bank holidays may not close TARGET2/T29 nationwide + regionalDo not equate a Land holiday with a TARGET2/T2 closure
SwitzerlandMon–FriCantonal rules; limited federal substitution26 cantonsBank and SIX exchange calendars follow cantonal and market noticesCantonal; varies widelyVerify canton-level bank and exchange schedules
CanadaMon–FriFederal and provincial Mondayization where applicableProvinces and territoriesPayments Canada and exchange calendars are separate; provincial holidays matter5 federal + provincialProvincial Family Day, Civic Holiday, and local dates create gaps
AustraliaMon–FriMondayization generally applies where holiday falls on weekendStates and territoriesASX and banking calendars differ by state; some local show days~7 national + stateCheck state Labour Day and regional show days
New ZealandMon–FriMondayisation applies to many national and regional holidaysNational + regional anniversary daysNZX and bank settlement calendars can differ from regional observances~11 national + regionalRegional anniversary days are easy to miss
SingaporeMon–FriSunday holiday generally observed on Monday; official gazette controlsNationalMAS/FAST/GIRO and SGX calendars should be checked separately~11Lunar New Year, Hari Raya, Deepavali dates are movable
JapanMon–FriSunday holiday observed Monday; citizen’s holidays create bridgesNationalBOJ/JPX calendars are separate; year-end bank closures are operational~16Golden Week and New Year are multi-day capacity shocks
IndiaMon–Fri (varies)Central and state notifications; festival dates varyUnion, state, localRBI bank holidays, exchange calendars, and state holidays can divergeVaries by stateDo not use one national list for payroll or settlement
United Arab EmiratesFederal Mon–Fri; private sector variesOfficial decrees; Islamic holidays subject to moon sightingFederal and emirate-levelCentral bank, local banks, and DFM/ADX calendars should be checked separatelyVariesFriday may be shortened; Eid dates are proclamation-dependent
Saudi ArabiaPublic sector Sun–Thu; private sector variesOfficial royal decree; Islamic holidays subject to moon sightingNationalBank and Tadawul calendars are separate; weekend geometry affects overlapVariesSun–Thu workweek changes overlap with Mon–Fri teams

Analytical takeaways. First, the U.S., U.K., Canada, Australia, and India show that “national” holiday counts are misleading without subdivision data. Second, Germany and Switzerland demonstrate why bank-rail calendars cannot be inferred from national public holidays; TARGET2/T2 and SIX have distinct operating notices. Third, Singapore, Japan, India, the UAE, and Saudi Arabia carry movable-holiday and workweek geometry risks that a simple Gregorian calendar will miss. Fourth, exchange early closes and fixed-income recommendations create half-day operational risk even when the date is not a statutory holiday. A distributed team should store all four calendar layers and calculate overlap from actual working hours, not from a single country-level holiday feed.

Regional Variations, Subdivisions & Operational Edge Cases

German Bundesländer and TARGET2 Divergence

Germany has nine nationwide public holidays plus regional holidays that apply only in specific Bundesländer. Epiphany, Corpus Christi, Assumption, Reformation Day, All Saints’ Day, and other observances are not uniformly nationwide. A Munich-based team may be closed for a holiday that does not affect Berlin, while TARGET2/T2 remains open on many German regional holidays. For payroll, the Land matters; for settlement, the TARGET2/T2 calendar matters; for trading, the exchange calendar matters. Treating “Germany” as one calendar creates both over- and under-counting.

Swiss Cantonal Holidays

Switzerland’s federal holiday structure is limited, and most public holidays are set at cantonal or municipal level. Cantons differ on dates such as Berchtoldstag, Glarus’s Näfelser Fahrt, and various religious observances. Bank and exchange operations may follow cantonal bank holidays or market-specific notices rather than a single national list. For distributed teams with Swiss employees or counterparties, the minimum data field is canton, not country. For treasury, the relevant calendar is the bank or exchange calendar, which may not match the employee’s leave calendar.

United Kingdom: England, Scotland, Northern Ireland

UK bank holidays are not uniform across the devolved nations. Scotland has additional dates such as 2 January and St Andrew’s Day in some years; Northern Ireland observes dates such as St Patrick’s Day and the Battle of the Boyne. England and Wales have their own bank-holiday schedule. A UK-wide payroll or SLA calendar that uses only England and Wales will miss Scottish and Northern Irish absences. Equally, a bank holiday does not automatically close every market or clearing service; exchange and payment operators publish separate notices.

Canadian Provinces and Australian States

Canada’s federal statutory holidays are few, and provinces add dates such as Family Day, Victoria Day, Civic Holiday, and Truth and Reconciliation Day in some jurisdictions. Australia’s national holidays are supplemented by state and territory dates, including different Labour Day dates and regional show days. For teams with employees in Toronto, Calgary, Sydney, and Melbourne, a single “Canada” or “Australia” calendar is operationally insufficient. Payroll and capacity plans should store province or state, and market calendars should store the exchange and settlement venue.

Bank-Open vs. Market-Closed and Early-Close Divergences

Financial operations frequently face dates when the bank is open but the market is closed, or the market is open but the relevant payment rail is closed. U.S. fixed-income recommendations can differ from equity-exchange holidays; European exchange calendars can differ from TARGET2/T2 closures; local bank branches can close for a regional holiday while electronic settlement continues. Early closes are a separate edge case: a market may close early on a date that appears as a normal business day in payroll and banking systems. SLAs that measure “same-day” response must know whether the operational day ends at the normal close or an early close.

Sun–Thu and Sat–Wed Workweeks

MENA and GCC workweeks can be Sun–Thu, Sat–Wed, or Mon–Fri depending on country, sector, and employer. A Sun–Thu team shares no working days with a Mon–Fri team on Sunday, and its Thursday may be the other team’s Friday. Overlap windows shrink accordingly. When planning sprints or SLAs, record the workweek pattern explicitly and compute the intersection of working days, not just time-zone offsets. Islamic holidays, Friday prayer breaks, and Ramadan reduced hours can further change effective capacity.

Movable and Lunar Proclamation Risk

Eid al-Fitr, Eid al-Adha, Diwali, Lunar New Year, and other lunar or religious holidays are not stable Gregorian dates. Official moon-sighting committees or government proclamations can shift the observed date by a day, and different countries may observe different days. For cross-border payroll and settlement, the safe approach is to maintain a provisional date range, identify the official confirming source, and freeze the calendar only after proclamation. For sprint planning, avoid committing critical releases on the first working day after a movable holiday; capacity may be lower than the nominal calendar suggests.

Step-by-Step Operational Planning Playbook

  1. Inventory the population and legal calendars. For every employee, contractor, approver, and counterparty, record country, subdivision (ISO 3166-2 where applicable), workweek pattern, contractual holiday entitlement, and leave plan. Do not start from a single country-level holiday list.
  2. Build a four-layer master calendar. Store statutory, regional, bank/payment-rail, and exchange calendars separately. Tag each entry with source, publication date, effective date, and confidence level (confirmed, provisional, or proclamation-pending).
  3. Calculate individual available workdays. Subtract holidays only when they fall on scheduled workdays, then subtract approved leave, known absences, and a capacity buffer. Aggregate only after per-person calculation; this prevents shared-calendar double counting (ONES, 2026).
  4. Map payment and settlement cutoffs. For each payroll, vendor, or treasury process, list the rail, cutoff time, time zone, value date, and holiday calendar. Add a buffer for correspondent-bank and time-zone dependencies. Verify TARGET2/T2, Fedwire, ACH, local clearing, and SWIFT-dependent chains separately.
  5. Audit overlap windows. Compute synchronous overlap from actual working hours and workweek geometry. Identify decisions that require live discussion versus asynchronous handoff. Set review windows with explicit deadlines and time zones, and record owners for unresolved questions (ONES, 2026).
  6. Design holiday-aware SLAs. Define coverage calendars, primary and backup owners by region, paused-clock rules, escalation paths, and incident-versus-routine thresholds. Make holiday exceptions auditable and visible to service owners.
  7. Plan sprints with buffers. Reduce scope or extend the sprint when capacity is holiday-adjusted. Sequence work so that dependent tasks do not land on a region’s non-working day. Use asynchronous planning artifacts with purpose, acceptance expectations, and dependencies (ONES, 2026).
  8. Manage bridge days and peak leave. Flag bridge-day risks, school-holiday peaks, year-end closures, Golden Week, Lunar New Year, Eid periods, and Diwali. Where possible, stagger leave and cross-train backups rather than assuming continuous coverage.
  9. Automate but verify. Subscribe to official government, central-bank, and exchange notices; integrate calendar feeds into workforce and payment systems; but keep a named owner for proclamation-pending dates and early closes. Jira board working days alone will not update SLA calendars or automation schedules (Tiraisoft, 2026).
  10. Run quarterly and annual audits. Reconcile capacity actuals against plan, review missed SLAs and settlement exceptions, update subdivision and workweek data, and archive the source evidence for audit. Treat the calendar as controlled operational data, not a static HR poster.

Common Misconceptions & Compliance Pitfalls

Myth

A country has one official holiday calendar that applies to payroll, banks, and markets.

Fact

Reality: Germany’s Bundesländer, Switzerland’s cantons, Canada’s provinces, Australia’s states, and the U.K.’s devolved nations all create subdivision-level holidays, while TARGET2/T2, Fedwire, ACH, and exchange calendars follow separate operating notices. Using one national list can undercount local leave and misstate settlement risk.

Myth

If the exchange is closed, banks and payment rails are closed.

Fact

Reality: Exchange holidays, bank holidays, and payment-rail holidays can diverge. U.S. fixed-income recommendations may differ from equity-exchange schedules; European exchanges may close on dates when TARGET2/T2 remains open; local bank branches may close for a regional holiday while electronic settlement continues.

Myth

Eid al-Fitr, Eid al-Adha, Diwali, and Lunar New Year have fixed annual dates.

Fact

Reality: These holidays are lunar, lunisolar, or proclamation-based and can shift by jurisdiction and year. Capacity plans should carry provisional ranges and a named owner for official confirmation before payroll or settlement deadlines are frozen.

Myth

A shared team calendar is enough to plan distributed capacity.

Fact

Reality: Regional holidays can leave a plan short of capacity even when every role appears staffed; best practice is to calculate each person’s availability and then aggregate (ONES, 2026). Shared calendars often count one region’s holiday while missing another’s and can double-count overlapping absences.

Myth

Silence in an asynchronous sprint review means approval.

Fact

Reality: Asynchronous planning requires clear review windows, deadlines, and time zones, and silence must not be treated as consent (ONES, 2026). Holiday periods increase the risk that unanswered questions become unowned blockers.

Myth

Updating a Jira board’s working days updates all SLA and automation calendars.

Fact

Reality: Jira board working days change burndown, sprint, and velocity reports and nothing else; Jira Service Management SLAs keep their own holidays, and Jira Automation knows only Monday to Friday (Tiraisoft, 2026). Holiday coverage must be configured and tested in each system that owns a deadline.

How to Explore Further on HolsDB

Use the HolsDB hub structure to move from general planning to jurisdiction-specific data. Start with Country Holiday Hubs at /holidays/ for statutory and public-holiday baselines, then verify regional and subdivision exceptions at /regions/. For treasury, settlement, and trading operations, use Bank & Market Closures at /markets/ to separate payment-rail calendars from exchange schedules and early closes. For workforce and payroll planning, go to Working Days & Payroll at /working-days/; for leave-bridge and peak-absence analysis, use Long Weekends at /long-weekends/; and for school-term-related absence planning, use School Holidays at /school-holidays/. Interactive utilities at /tools/ include the Business Days Calculator, Cross-Border Team Overlap Checker, PTO Maximizer, and .ics Calendar Builder. These tools are most reliable when each team member’s country, subdivision, workweek, and calendar layer are entered explicitly.

FAQ

How should a distributed team build a holiday overlap calendar?

Record each person’s country, subdivision, workweek, daily hours, statutory holidays, regional holidays, and approved leave. Then calculate individual available workdays before aggregating team capacity. Separately store bank/payment-rail calendars and exchange calendars, because those operational closures may not match employee leave calendars.

Do bank holidays and exchange holidays always match?

No. Central-bank payment rails, commercial bank branches, clearing systems, and exchanges can follow different calendars. For example, a regional bank holiday may not close TARGET2/T2, and U.S. fixed-income recommendations can diverge from equity-exchange schedules. Always verify the specific rail or venue.

How do movable holidays affect sprint planning?

Eid al-Fitr, Eid al-Adha, Diwali, Lunar New Year, and similar holidays can shift by jurisdiction and official proclamation. Sprint plans should use provisional date ranges, add capacity buffers, and avoid committing critical releases immediately after movable holidays until the dates are confirmed.

What is Mondayization in holiday planning?

Mondayization is the rule that observes a weekend holiday on the following Monday. Some jurisdictions use Friday substitution instead, and others do not substitute at all. The rule affects payroll workdays, SLA coverage, and settlement cutoffs, so it must be modelled per jurisdiction and subdivision.

How should SLAs handle public holidays?

SLAs should use a published coverage calendar with named primary and backup owners by region, explicit paused-clock rules, and escalation paths across time zones. Holiday exceptions should be auditable. Critical incident response may require holiday coverage even when routine review SLAs pause.

References

  1. ONES — How to Account for Regional Holidays in a Distributed Engineering Team Capacity Plan (https://ones.com/blog/how-to-account-for-regional-holidays-in-a-distributed-engineering-team-capacity-plan/)
  2. ONES — A Checklist for Planning a Sprint Asynchronously Across Time Zones (https://ones.com/blog/a-checklist-for-planning-a-sprint-asynchronously-across-time-zones/)
  3. Holiday Overlap — The Remote Team Manager's Guide to International Holiday Scheduling (https://holidayoverlap.com/blog/2026-04-01-remote-team-holiday-scheduling-guide/)
  4. Tiraisoft — Jira holidays: where to add them, and what each one changes (https://jirarecurring.tiraisoft.com/blog/jira-holidays/)
  5. Federal Reserve Board — Federal Reserve holiday schedule (https://www.federalreserve.gov/aboutthefed/k8.htm)
  6. GOV.UK — UK bank holidays (https://www.gov.uk/bank-holidays)
Editorial & Data Verification: Dates and holiday rules in HolsDB are verified against primary government portals, central bank calendars, and exchange notices. Review our Data Sources & Methodology or Report a Correction.